We combine rigorous structural analysis and practical experience to provide a unique nationwide service for architects and specialist glazing contractors
Building M1, Statford City, London
Oct 2010
The structurally glazed Schüco curtain wall façade is suspended from a preloaded head structure to isolate the façade from floor slab deflection.
Clear Structures were responsible for providing structural design services for various elements of Building M1 Stratford City, London these included:
• North elevation curtain walling
• North elevation shop front glazing
• North elevation reglit glazing
• Glazed main entrance canopy
• Facetted curtain wall and media screen
• Facetted shop front glazing
• Rain-screen cladding
The above image shows the glazing being lifted onto the North façade of Building M1 at Stratford City.
Archive
Sep 2011
Prospects College Award Ceremony
Clear Structures and Thomasons were pleased to support local engineering apprentices and sponsored the award for Schools to Careers – Engineering – Most Improved Learner.
Aug 2011
Marischal College
Clear Structures were appointed as glazing engineers for the bolted glass main entrance screens for the £81 million redevelopment of the Marischal College.
Jun 2011
Dublin Airport
Clear Structures were commissioned to provide the design for a triple lift block and a two storey double lift block,
Oct 2010
Building M1, Statford City, London
The structurally glazed Schüco curtain wall façade is suspended from a preloaded head structure to isolate the façade from floor slab deflection.
Jul 2010
Wallbrook Building, London
At The Wallbrook Building in Central London, Clear Structures was responsible for the design and specification of the glass surrounds to the 4 feature lifts.
Jun 2010
Rochester Cathedral
Visitors to Rochester Cathedral are now welcomed by two new stunning glass lobbies to the West and North entrances of Rochester Cathedral that provide added protection from wind and rain.
May 2010
Prospects College
The main structure contract is now nearing completion at Prospect College.
Apr 2010
Barclays Bank Southend
Clear Structures were recently commissioned to design the bolted glass entrance screen for the new Barclays Bank in Southend on Sea, High Street.
Mar 2010
University Placements
Dave Walker (left) and Richard Lee (right) are both currently studying at University of East London to gain a degree in BEng Civil Engineering.
Feb 2010
Highbury Square
Clear Structures were responsible for the design of the water wall feature used at the redevelopment of the historic Highbury Stadium.
Jan 2010
Prospect College
Work has now commenced on the re-development of an existing food processing factory into a Construction College Centre of Excellence.
Dec 2009
Warwick Lodge
Warwick Lodge is a bespoke state of the art 3 storey specialist dental centre in an established residential area conceived to enable provision of treatment in a comfortable setting




